Just a little more progress. All the framing is cut for the front deck. The livewell is insulated. Now to frame the back deck and rivet everything. Then some wiring. Then deck carpet and finally install the motor. And FISH.
Life got in the way for a bit but I’ve been making slow progress. Got all the rivets tightened up and sealed. Some painting and redid the floor. I have carpet in too and started framing the deck. I’ll get some more pictures tomorrow.
I’ve already filled out and found the two little leaks. I’m going to replace the rich and then coat all of the rivets with Coat It. I just really want to see how it floats and drifts before I start building it. And get some fishing in before I can’t.