TinBoats.net
The original aluminum boat site!
Forums
New posts
Search forums
Blog
What's new
New posts
New media
New media comments
Latest activity
Media
New media
New comments
Search media
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Jet Boats
Jet Boat Projects
He Reigns Mon Ark project
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Help Support TinBoats.net:
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="He Reigns" data-source="post: 353482" data-attributes="member: 14103"><p>Well she is done enough to put in the water. Gas tank has good mount but need better bungee cord mounts, oil tank seems ok where it is mounted. The electronics box is about right. The battery is not in permanent location because I need longer cables, but its mounted to test run. The forward bulkhead is close to done. Steering is mounted. I still need to mount reverse lever, the choke cable, start switch. Everything is hooked to motor so I can use it. The things not mounted are laying on floor. Many hoses and wires need shortened. I'll try and do another video in the morning before going to church, after church she gets wet......hopefully only on the outside. </p><p></p><p>For reference so far we have 29 hours of two guys working on it and 22 hours of research.</p></blockquote><p></p>
[QUOTE="He Reigns, post: 353482, member: 14103"] Well she is done enough to put in the water. Gas tank has good mount but need better bungee cord mounts, oil tank seems ok where it is mounted. The electronics box is about right. The battery is not in permanent location because I need longer cables, but its mounted to test run. The forward bulkhead is close to done. Steering is mounted. I still need to mount reverse lever, the choke cable, start switch. Everything is hooked to motor so I can use it. The things not mounted are laying on floor. Many hoses and wires need shortened. I'll try and do another video in the morning before going to church, after church she gets wet......hopefully only on the outside. For reference so far we have 29 hours of two guys working on it and 22 hours of research. [/QUOTE]
Verification
Post reply
Forums
Jet Boats
Jet Boat Projects
He Reigns Mon Ark project
Top