ndthwacker
Well-known member
well this is how it all started a 9 hour drive from north dakota to iowa for a 2005 tracker grizzley 1448 all weld mod v jon boat.
This was right after i purchesed it. I was happ y with the shape of the boat looks hardly used.
As soon as i got home of course my black lab koda had to find her spot in the new boat.
Here is where the seats, rod holders, the rope lights, depth finder, My home made switch box that you can see better in the next two picters, the gas tank, my 1992 25 hp suzuki motor, and the start of the wireing is finished. This took us maybe 4 hours.
This is when i started the floor i put down 1.5 in foam inbetween the ribs for support.
This is the pre cut 48by65in piece of aluminum that is .063 in thinck i believe thats a sixteenth.
2 shots of the front and back in dimmer lights
This is the start of the deck adjustable deck that is not attached to the boat in any way the deck is also removable from the railings so you can just have the railings up if you wanted to in anyone is wants more detailed pictures of anything i can do that just let me know.
This is where the middle platform is getting made to be attached to the railings
Front view with adjustable front is deck attached
The rest of the picture are just the finishing touches and finished boat there are still a few odds and ends i have to do to completly finish is me and my buddy who is in some of those pictures finished this project in about a total of 24 hours. now its a waiting game from the snow melt. Let me know whwat you think and if you have anny suggestions or questons please let me know maybe you have a way for me to improve something yet.
This was right after i purchesed it. I was happ y with the shape of the boat looks hardly used.
As soon as i got home of course my black lab koda had to find her spot in the new boat.
Here is where the seats, rod holders, the rope lights, depth finder, My home made switch box that you can see better in the next two picters, the gas tank, my 1992 25 hp suzuki motor, and the start of the wireing is finished. This took us maybe 4 hours.
This is when i started the floor i put down 1.5 in foam inbetween the ribs for support.
This is the pre cut 48by65in piece of aluminum that is .063 in thinck i believe thats a sixteenth.
2 shots of the front and back in dimmer lights
This is the start of the deck adjustable deck that is not attached to the boat in any way the deck is also removable from the railings so you can just have the railings up if you wanted to in anyone is wants more detailed pictures of anything i can do that just let me know.
This is where the middle platform is getting made to be attached to the railings
Front view with adjustable front is deck attached
The rest of the picture are just the finishing touches and finished boat there are still a few odds and ends i have to do to completly finish is me and my buddy who is in some of those pictures finished this project in about a total of 24 hours. now its a waiting game from the snow melt. Let me know whwat you think and if you have anny suggestions or questons please let me know maybe you have a way for me to improve something yet.