Got back from the beach on Sunday and was able to get the holes drilled in the transom wood and my 3rd and final coat of epoxy resin applied. Also started applying spar urethane which I plan to do 2-3 coats of. It feels like this damn transom has turned into my child. Have gone from watching it born, grow up and now I just want it out of my house!!!! Last night I got to play with my shiny new impact hammer and set a few rivets. Was alot easier than I thought it was going to be.
First coat of spar urethane. I'm planning on 2 maybe 3 coats for UV protection.
Tools of the trade. I didn't realize, until after I opened it, that you needed to use up the 5200 within 48 hours of opening or it will cure in the tube. Guess I'll have to pick up another tube since I won't be getting the transom put in until probably Monday.
Here is the first few rivets I set. This is sealing the holes that the PO used to mount his transducer. Man is that 5200 messy!!
Here is the inside of the transom with the same rivets. Seemed to be set pretty good. Not bad for a first timer.
A few more rivets I set. These are holding the gas tank holder in place.
Gas tank holder re-installed. Solid rivets are actually easier to work with than pop rivets IMO.
I've got a busy weekend ahead, so nothing exicting with the boat will be happening. I've had seaseon tickets to Maryland football ever since I gratuated ('04) and the season opener is Saturday. Then we are having a cookout on Sunday and will be closing the pool on Monday. Need to help my wife get the house cleaned and ready for the cookout. I'm in charge of the rec room which is a MESS since I've been epoxing and sanding in there for the last week :shock: Hopefully I can get my urethane coats done by tomorrow evening so I can have it ready to install on Monday. Then I'll give the 5200 a good week to cure and get this bad girl on the water for the first time!!!