rook
Well-known member
Well got the batt re-arranged and the back and front deck all but finished. Still have to figure out what I am gonna do with the back hatch and still have some wood work to do up front.
rook said:Then came the livewell. In the original layout of the back deck it ran bow to stern in between the drivers seat and passenger seat. With the new layout it will be port to starboard and will be used as the seat. After a little plumbing work I think its gonna work like I wanted. I also had to drill 9 rivets out during tear down so i had to get those sealed back up as well. Some small stainless bolts and 5200 done the trick.
Flatsdaddy said:Sweet boat, nice work.
I may have missed it, but what primer and paint did you use? I like that color and would love to go with that on mine.
Did you use the same paint on the top and bottom?
Enter your email address to join: