Ok so today i:
-installed installed a second battery up front for the troller.
-installed a charging bank.
-moved rear battery.
-installed stern light and bow light
-installed bilge pump and through hull exit feed.
-cut hole for control panel.
Tomorrow its fishing wires to connect nav lights, bilge pump, & connect all to controll panel.
Sent from Mossy Oak Swamp Bottom
-installed installed a second battery up front for the troller.
-installed a charging bank.
-moved rear battery.
-installed stern light and bow light
-installed bilge pump and through hull exit feed.
-cut hole for control panel.
Tomorrow its fishing wires to connect nav lights, bilge pump, & connect all to controll panel.
Sent from Mossy Oak Swamp Bottom