Couple things in the last few days
Rear framing is done - including the supports for the seat base...going with the same setup in the rear as I had in the canoe.
I also laid in two lengths of 1/16" FRP to make a smooth bottom - especially on the port where the rod locker is going...not going to have tubes, just lay the rods in...it's 8' long from the stern-most end to the bow-most end...just have to finish framing the area in the bow. The FRP will be screwed into the metal braces that go from the subfloor frame to the rib ends and a bead of adhesive will seal the top edge to the hull to prevent water flowing in under it.
Front framing has started - right up in the bow are the main supports for the new battery tray, couple of the uprights for the casting deck are in. Once I get at least another pair of verticals in I can mount the P/S hull supports for the deck.
Before I do more verticals though, I have to at least frame up the storage compartments...these are going to be drop-in units lined with 1/4" HDPE on the bottom and 1/16" FRP on the sides. Need these built next as the framing for the deck needs to be spaced properly for these to fit in. Sized to vertically fit 8-3701 boxes - or any combo of 3700 series boxes not more than an 11.1" 'stack' - 1-3700 plus 6-3701 as an example - space is 11.125" and 8-3701 boxes total 11.04"...slight extra so the boxes aren't tight in the compartment.
One is done - need to make five more before the deck framing can continue. I'm making them this size instead of fewer/larger as the 5/8" BCX I'll be using as the decking can support a person over this span...but not much larger...so the hatch-lids will be walk-upon safe.
Rear framing is done - including the supports for the seat base...going with the same setup in the rear as I had in the canoe.
I also laid in two lengths of 1/16" FRP to make a smooth bottom - especially on the port where the rod locker is going...not going to have tubes, just lay the rods in...it's 8' long from the stern-most end to the bow-most end...just have to finish framing the area in the bow. The FRP will be screwed into the metal braces that go from the subfloor frame to the rib ends and a bead of adhesive will seal the top edge to the hull to prevent water flowing in under it.
Front framing has started - right up in the bow are the main supports for the new battery tray, couple of the uprights for the casting deck are in. Once I get at least another pair of verticals in I can mount the P/S hull supports for the deck.
Before I do more verticals though, I have to at least frame up the storage compartments...these are going to be drop-in units lined with 1/4" HDPE on the bottom and 1/16" FRP on the sides. Need these built next as the framing for the deck needs to be spaced properly for these to fit in. Sized to vertically fit 8-3701 boxes - or any combo of 3700 series boxes not more than an 11.1" 'stack' - 1-3700 plus 6-3701 as an example - space is 11.125" and 8-3701 boxes total 11.04"...slight extra so the boxes aren't tight in the compartment.
One is done - need to make five more before the deck framing can continue. I'm making them this size instead of fewer/larger as the 5/8" BCX I'll be using as the decking can support a person over this span...but not much larger...so the hatch-lids will be walk-upon safe.