randyo3629
Well-known member
ANOTHER PROJECT. 3RD IN 4 YEARS. tracker pro deep v 17
i believe this the boat i'm going to keep. i wanted a boat that i can set "in" not "on top" of. purchased from a fellow in n. illinois. turned around and sold the 40hp johnson, making my investment $400.00. removed the 30hp suzuki from my old tracker tx170 and installed on this one. this thing will fly with a 30 hp. sold the tx170. Need to replace the floor because the carpet is rough and floor soft. going with vinyl on the main floor, carpet (leftover) for the front deck. already swapped over the anchormates, replaced bilge pump, replaced rear curtain, new tongue jack and replaced front deck few months ago. Upcoming winter repairs: new gauges, switch panel, gutting all the 1990's wiring and replacing/rewiring, replacing all 4 bunks, installing fish finder, recovering/replacing all compartment lids, replacing wheels/tires, pack bearings, rewiring trailer and other miscellaneous items.
had to cut around 36 screws to get the floor out, one screw came out, 4 broke off.
will post more as work progresses.
1-1-2021: floor finished and installed
i believe this the boat i'm going to keep. i wanted a boat that i can set "in" not "on top" of. purchased from a fellow in n. illinois. turned around and sold the 40hp johnson, making my investment $400.00. removed the 30hp suzuki from my old tracker tx170 and installed on this one. this thing will fly with a 30 hp. sold the tx170. Need to replace the floor because the carpet is rough and floor soft. going with vinyl on the main floor, carpet (leftover) for the front deck. already swapped over the anchormates, replaced bilge pump, replaced rear curtain, new tongue jack and replaced front deck few months ago. Upcoming winter repairs: new gauges, switch panel, gutting all the 1990's wiring and replacing/rewiring, replacing all 4 bunks, installing fish finder, recovering/replacing all compartment lids, replacing wheels/tires, pack bearings, rewiring trailer and other miscellaneous items.
had to cut around 36 screws to get the floor out, one screw came out, 4 broke off.
will post more as work progresses.
1-1-2021: floor finished and installed