Plywood vertical supports cut out, fitted, and first coat of spar. Another coat of spar and then some primer and paint and they can be installed. Should be rock solid once these are in.
Beginning stages of the trolling motor mount. Clamped my piece of 1/4" to the top of the rails to find the proper plane. Then glued up a couple templates.
Sheet cut to size and pop riveted into place til it can be welded. Once these were in I placed the piece of 1/4" plate where I wanted it and simply reached under with a sharpie and marked out my cut
So I've been doing hardwood flooring to make a living for the past 23 years now. This weeks job was waterfront property at a local lake. Pretty cold in northern Illinois yet but thought I'd take a few rods with me this week. This was about the 5th cast or so. A bit over 2lb I think. Was happy to stir one up from the bank this early in the year
Me either! You'll have to take my word for it! Caught a decent largemouth! I tried to load it up again and no go! I guess it's just another fishing tale!
Just a current shot of the front deck. Clamped a seat in just to lean against. Really solid and it's just two clamps with no bolts and no deck. Should be even better when all finished up!
Hoping to be done with the framing this weekend! My buddy that is welding it up will be out of town till Wednesday, but he's planning on finishing up right when he gets back! Paint in a couple weeks!
I have all the framing cut and either clamped or riveted into place! There are 5 pieces that need to be stitched yet when my buddy gets back into town.